Posted on February 26, 2019 at 8:22 AM by Clara Siegele
Boring the river with a new 18 inch water conduit was completed in 2015. It assures Purcell of multiple water service supplies. Two other smaller but significant lines cross the River. One was completed in 2017 to replace a span that hung under the old bridge. The other is less than 20 years old.